Newcastle + Lake Macquarie A kept record · entries dated and sourced

News · Council · Newcastle

Newcastle’s cultural plan sets 12 measures of success. One has a number, and it matches the plan’s own forecast

City of Newcastle’s Cultural Plan 2026-2036, adopted unanimously on 28 July, lists three measures of success for each of its four pillars. One has a number and a date: 1,200 additional creative jobs by 2036. The plan’s own economic appendix forecasts about that much growth anyway. Of the other eleven, four are things the council can deliver or not, and seven say only which way something should move, from no stated starting point and by no stated date.

The Hunter Ledger · 5 October 2026 · 7 primary sources, read 5 October 2026

Council: a Hunter Ledger data graphic

Corrected 4 November 2026. We wrote that the advisory committee’s next meeting was listed for 3 November. The City’s meeting portal, checked on 4 November, lists the Community and Culture Strategic Advisory Committee’s next meeting for 30 November 2026. The meeting on 3 November was a different committee, Liveable Cities. We have changed the text and the timeline below.

The short answer. A resident in 2030 could check five of the twelve: whether a floorspace study, new cultural space in the renewal precincts, a microgrants trial and new event infrastructure exist, and how many creative jobs the city has. The other seven ask for “more”, “increased” or “improved” without a baseline, and three of them are about how residents feel, though the plan names no survey that would ask them. Progress reports are promised to a council advisory committee, yearly, with no date for the first.

In July we reported the adoption from the council’s own summary and said we would come back to the measures of success once they were published. They were already online: the adopted plan is served from the project page with a Last-Modified date of 29 July, the day before our story ran. This is that follow-up, late. We have now read the plan end to end, the report councillors voted on, the minutes of the vote, the exhibited draft and the two consultation reports. Page numbers are the plan’s printed ones; its PDF shows two pages per screen.

The twelve measures

Each pillar page carries a block headed Measuring our success and tracking our progress towards a creative Newcastle (pages 50, 52, 54 and 56; all twelve also appear on the Plan on a Page, pages 12 to 13). We have sorted them by what a reader could actually check.

Twelve measures, and what kind of promise each one is

Three per pillar, named by the plan’s own KPI labels. The sorting is ours.

Identity & Inclusionpage 50

  • Representation & InclusionDirection, a feeling
  • Geographic EquityDirection
  • Identity & BelongingDirection, a feeling

Spaces & Placespage 52

  • Affordable Creative SpaceDirection
  • Evidence & PlanningDone or not
  • Cultural InfrastructureDone or not

Creative Workforce & Industrypage 54

  • Creative Employment1,200 jobs by 2036
  • Sector SupportDone or not
  • Organisational CapacityDirection

City Life & Vibrancypage 56

  • New InfrastructureDone or not
  • Precinct ExperienceDirection, a feeling
  • Audience DiversityDirection
KPI names and pillar pages: City of Newcastle, Cultural Plan 2026-2036, pages 50 to 57. The five filled tiles are the ones a resident can test against a stated number or a done-or-not result; the seven outlined tiles ask for a direction of change by no stated date. Full wording is in the table below.

What the Cultural Plan says it will measure

Wording from City of Newcastle, Cultural Plan 2026-2036, pages 50 to 57. Sorting into the right-hand column is ours.

PillarMeasure, in the plan’s wordsNumber or date?
Creative Workforce & Industry1,200 additional jobs are created across Newcastle’s arts, culture and creative industries by 2036Number and date. The only one
Creative Workforce & IndustryA microgrants initiative is trialled by CN for a minimum of two years.A duration, no start date. Done or not
Spaces & PlacesA robust evidence base for cultural infrastructure planning has been developed, including an LGA-wide assessment of community and cultural floorspace.Done or not, no date
Spaces & PlacesNew cultural and community infrastructure is delivered or secured within Newcastle’s major growth and renewal precinctsDone or not, no quantity or date
City Life & VibrancyNew infrastructure is delivered to support major events and festivals in the public domain.Done or not, no quantity or date
Identity & InclusionPeople from First Nations, multicultural, disability, LGBTQIA+, youth and other under-represented communities report feeling represented, welcomed and able to participateDirection only. A perception
Identity & InclusionParticipation in cultural activities increases in Newcastle’s western suburbsDirection only
Identity & InclusionMore residents identify Newcastle as a city with a distinct cultural identityDirection only. A perception
Spaces & PlacesMore artists, creatives, cultural organisations and community groups have access to affordable, fit-for-purpose spacesDirection only
Creative Workforce & IndustryCN expands its cultural workforce to support the delivery of this planDirection only
City Life & VibrancyEvidence of improved perceptions of safety, accessibility and amenity in cultural precincts and late-night trading areas, particularly after darkDirection only. A perception
City Life & VibrancyIncreased participation in cultural events and experiences among under-represented audiences, including culturally diverse communities and people attending aloneDirection only
One measure has a number and a date, four are deliverables (one of them with a minimum duration), seven give a direction of change. The plan’s action tables (pages 58 to 59) give each action a timeframe band (short 2026-2028, medium 2026-2031, long 2026-2036); the measures themselves carry none except the jobs figure.

Two of the seven directional measures have a starting point somewhere else in the plan. For the council’s own cultural workforce, its “Culture by Numbers” page counts 60+ full-time cultural experts at City of Newcastle (page 17). For the rest, no baseline is given. The word “survey” does not appear anywhere in the adopted plan (we searched the full text on 5 October), so it does not say how the three perception measures will be asked.

The one with a number: 1,200 jobs, from what

The base is in the plan. “Culture by Numbers” records 3,472 full-time jobs in creative workforce (2024) (page 17). The text on page 26 says that As of 2024, almost 3,500 people were employed full-time in the sector locally. This is forecast to grow by a further 1,200 jobs by 2036. Its footnote points to Bull+Bear forecast in Appendix.

That appendix (page 63) is a table headed Economic Contribution Growth Scenario, sourced to Bull & Bear Economics (2025). Its direct employment row, in full-time equivalents, runs 3,472 in 2024, 3,653 in 2026, 4,150 in 2031 and 4,709 in 2036. That is 1,237 more over twelve years, about 2.6 per cent a year (our arithmetic). The same scenario forecasts direct value added rising from $564.76 million to $749.17 million. So the measure of success for the workforce pillar is, give or take 37 jobs, the growth the plan’s consultants modelled in 2025, before the plan was adopted.

The forecast already gets there

Direct creative employment in full-time equivalents, as the plan’s appendix forecasts it, with the measure of success set against it.

  1. 2024, the base3,472 full-time-equivalent jobs
  2. 2026, forecast3,653
  3. 2031, forecast4,150
  4. 2036, forecast4,709, which is 1,237 more than 2024 Measure 1,200 additional jobs by 2036
Forecast: Bull & Bear Economics (2025), Economic Contribution Growth Scenario, Cultural Plan page 63; the 2024 base also on page 17. Measure: page 54. The 1,237 is our arithmetic.

Three things the plan does not say, as at 5 October 2026:

Two yardsticks in the same plan

Modelled

3,472

full-time-equivalent jobs, 2024

Bull & Bear Economics forecast model. The base the 1,200 is measured from (pages 17 and 63).

Counted

3,134

workers, 2021

ABS Census, by industry of employment (page 60).

City of Newcastle, Cultural Plan 2026-2036. Different years and different methods, 338 apart (our arithmetic). The plan does not say which one the 2036 measure will use.

Councillors noticed. Adopting the plan, they carried an amendment moved by Cr Pringle that the council, Utilising Census 2026 data, the results of the 2026 Creative Workplaces survey report, public engagement on the Culture Plan and direct engagement with experts, undertake an assessment of industry development opportunities and training pathways to ensure that the Cultural Plan’s projections of an additional 1,200 creative jobs by 2036 are realised, reporting back through two advisory committees (minutes of 28 July, page 7). The council’s own resolution calls the figure a projection. It sets no date for the report.

What the draft measured that the adopted plan does not

The version put out for comment had a target with a baseline. Under “What Success Looks Like in 2036” the draft said Creative jobs continue to outpace other industries, with 6% of the total workforce employed in the creative sector (up from 4.1% today). (draft page 48). That share, and the 4.1 per cent starting point, are not in the adopted plan. The draft also listed an action for Completing an LGA-wide floor space and employment survey. This will allow CN to measure how much floorspace creative industries have gained or lost during the life of this plan and beyond. (draft page 67). The adopted plan keeps the floorspace assessment as a measure (page 52); the employment survey is gone.

Draft to adopted: three changes to what gets measured

Share of the workforce

DraftA target with a baseline: 6% of the total workforce employed in the creative sector (up from 4.1% today) (draft page 48)

AdoptedGone. No share and no 4.1 per cent baseline

Floorspace and employment survey

DraftAn action: Completing an LGA-wide floor space and employment survey (draft page 67)

AdoptedThe floorspace assessment is now a measure (page 52). The employment survey is gone.

1,200 jobs

DraftAn action: Supporting the creation of more than 1,200 new jobs in the broader creative sector (draft page 69)

AdoptedThe measure, and the only one with a number and a date (page 54)

City of Newcastle: the exhibited draft Cultural Plan (file dated 5 February 2026) and the adopted Cultural Plan 2026-2036. Page numbers are each document’s printed ones.

The 1,200 jobs moved too. In the draft it was an action, Supporting the creation of more than 1,200 new jobs in the broader creative sector, with the council working with Business Hunter, the University of Newcastle and the Hunter Creative Alliance to monitor trends and emerging opportunities (draft page 69). In the adopted plan it is the measure.

The absence of hard funding commitments, measurable actions and clear timelines was raised repeatedly

City of Newcastle, Draft Cultural Plan 2026-2036 Engagement Summary Report, page 6

Measures were what the consultation asked for. The council’s Engagement Summary Report says The absence of hard funding commitments, measurable actions and clear timelines was raised repeatedly, including by respondents who expressed overall support for the draft Plan. (page 6). At a 11 May workshop the council’s Community and Culture Strategic Advisory Committee noted the Plan could be enhanced by quantifiable success measures, though it was noted that this may be a next phase of work. (page 18). The council’s Public Exhibition Report answers: Measures of success and KPI frameworks were expanded. (page 6). The staff report to councillors says accountability concerns were mitigated through the addition of specific KPIs related to each pillar, with ongoing implementation reports planned for the Community & Culture Strategic Advisory Committee. (item 9.1, page 3).

When the council says it will report

The plan’s planning diagram routes reporting through the council’s standard documents, Performance Reports, the Annual Report and the State of our City Report, under Continuous monitoring and review (page 18). It sets no reporting date of its own.

The staff report adds that after endorsement an operational action plan will be developed for year one within the Creative & Community Services directorate. This action plan will be reviewed and updated annually over the Plan’s 10-year lifespan. (page 3). On costs, it says implementation will be funded through operational budgets over ten years, with multiple actions able to be funded initially through the adopted 2026/27 operational budget (page 2). A second amendment, moved by Cr Adamczyk and carried with the plan, Requests the yearly CP Implementation Plans are reported to advisory and standing committees as relevant, and records that endorsement should not be taken as endorsement of a Council commitment to co- (or fully) funding any new infrastructure (minutes, page 8). Two of the four deliverable measures are new infrastructure.

As at 5 October 2026, the advisory committee had met once since adoption, on 1 September, and its agenda had no Cultural Plan item. On 4 November the portal listed its next meeting for 30 November. We found no year-one action plan on the project page or in that agenda, and nothing in that agenda on the jobs assessment.

From a notice of motion to the first report, which has no date

Filled: happened. Open: listed or promised but not yet held, as at 4 November 2026.

  1. 23 July 2024Council unanimously backs a notice of motion asking for a 10-year cultural plan
  2. 24 February 2026Council resolves to put the draft on public exhibition
  3. 25 February to 19 April 2026Draft on exhibition
  4. 11 May 2026Advisory committee workshop: quantifiable success measures may be a next phase of work
  5. 28 July 2026Plan adopted unanimously, with amendments asking for a jobs assessment and yearly implementation plans
  6. 1 September 2026Advisory committee meets. No Cultural Plan item on the agenda
  7. 30 November 2026Advisory committee’s next scheduled meeting. No agenda had been published when we checked on 4 November
  8. No date givenYear-one action plan, the jobs assessment, the first implementation report
  9. 2036The plan ends, and the date on the 1,200 jobs measure
Report 9.1, pages 3 to 4 (the 2024 motion, the exhibition decision and dates, the year-one action plan); Engagement Summary Report, pages 1 and 18; minutes of 28 July 2026, pages 7 to 8; committee agenda of 1 September 2026 checked 7 October 2026, and the portal listing for 30 November, checked 4 November 2026.

Our view

This section is opinion, built on the facts above.

Could a resident check this plan in 2030? Partly. Four of its measures are honest yes-or-no questions, and a resident can ask them: is there a floorspace study, a microgrants round, new cultural space at Broadmeadow or Honeysuckle, new event infrastructure. The council should get credit for adding measures at all after the draft drew exactly that criticism.

But the measure most likely to be quoted back in 2036 is the weakest test of the plan. A target set at the level the plan’s own model forecasts measures the trend, not the plan: hit it and the plan cannot claim the credit, miss it and the forecast was wrong. It also has no settled yardstick, since the plan offers a modelled full-time-equivalent count and a Census headcount, for different years, 338 apart. The draft’s 6 per cent share of the workforce, with its 4.1 per cent baseline, was a sharper question, and it is the one that was dropped.

The seven directional measures need only one thing to become checkable: a starting figure and a named source for each, published with the year-one action plan. Councillors have already asked for the jobs assessment. Publishing the baselines alongside it would cost little, and it would let a resident in 2030 see whether “more” happened. We will read the year-one action plan and the first implementation report against these twelve when they appear.

Spotted an error in this story? Ask for a correction. Corrections are published, dated and left visible.